2024 IMC Significant Changes Overview
The 2024 IMC reorganizes the administrative chapter, adds definitions from the IBC and IFC, updates rooftop access, and lays the groundwork for the biggest refrigerant transition in decades.
Every hour in our packages is sold on its own for $19. Same content, same 50 minute timer, same certificate, same DBPR reporting. Filter by your trade to see only the hours your board accepts.
9 hours that count toward the Florida HVAC 14-Hour CE package (CILB)
All 14 together: $129 as a package versus $266 one at a time
The 2024 IMC reorganizes the administrative chapter, adds definitions from the IBC and IFC, updates rooftop access, and lays the groundwork for the biggest refrigerant transition in decades.
The single largest change in the 2024 IMC: A2L refrigerants in human comfort air conditioning, driven by the EPA mandate to phase down HFCs 85 percent over 15 years. Chapter 11, rewritten.
Six documented changes in Chapter 4, including the largest single increase in dwelling unit ventilation rates in over a decade, plus new Table 403.3.1.1 rows for occupancies the old table never covered.
Nine documented changes in Chapter 5, the second densest change block in the edition: multifamily common exhaust, commercial dryers, range hoods in care facilities, grease duct testing and kitchen hood exceptions.
Chapter 6 governs duct construction, materials and installation. The 2024 edition changes closet return air, duct coverings and linings, and through penetrations with fire dampers, on top of the fundamentals every install gets inspected against.
The source standard behind most of IMC Table 403.3.1.1, ASHRAE 62.1, and the current practice around it: IAQ measurement, demand controlled ventilation, energy recovery and commissioning.
Chapter 10 governs boilers, water heaters and pressure vessels. Two documented changes, new Section 931 on steam bath equipment and a pressure vessel scope exception, plus the installation, relief and clearance rules inspectors check first.
Chapter 12 governs hydronic piping for radiant floors, panel heating, snow and ice melt, and central hydronic distribution. Two documented changes on radiant and snow melt tubing, plus materials, pumps, expansion and commissioning.
The companion to the A2L hour: the four remaining Chapter 11 changes on refrigerant piping locations, surface temperature, pipe identification and hazard labels, shield plates and shaft ventilation, plus leak detection and emergency response.
Or get the whole thing in one click
Every mandatory hour and every technical hour your board requires, one purchase, one price. A package saves $110 to $137 against buying the same hours one at a time.